Wat_Tyler
Allah's Favorite
- Joined
- Apr 12, 2004
- Posts
- 53,693
Long day at the job site. Not too hot but the humidity must have been over 4000%. The exterior painters got pulled - their boss says we buggered the contract. Ya gotta love it. Built some elevator shaft barricades. Closed a bunch of windows because there is rain about. It was nearly dead in there today. Oh, and there are an assload of video training classes that Wat has to be subjected to. Sexual harassment. Where does he sign up????